marine construction projects image

Client – Agency / Owner: Pond Remediation Project

Project Description: Remediation and Removal of 30,000 cubic yards of material. Included Type “C” PPE, specialized equipment and procedures, and decontamination procedures.

Location: Deer Park, Texas

marine construction projects image

Client – Agency / Owner: Texas City Channel Pipeline Removal

Project Description: Decommissioning, Decontamination, Demolition, and Remediation of 2,600 feet of 16 inch pipe under the Texas City Ship Channel. Included the decontamination, demolition, and remediation of piping and the removal of 60,000 cubic yards of material.

Location: Texas City, Texas

marine construction projects image

Client – Agency / Owner: Pelican Island Barge Side Launch Construction

Project Description: Install 500' of new sheet piling bulkhead. Dredge out overburden of existing shoreline. Install new barge side launch beam system which consists of driving forty-eight 20" concrete piling and setting eight rows of 90' length 30" I-beams.

Location: Galveston (Pelican Island), Texas

marine construction projects image

Client – Agency / Owner: Mechanical Dredging Project

Project Description: Mechanically dredged 60,000 cubic yards of maintenance material for an operational shipyard facility. Coordinated dredging activities with 6 active dry docks and barge railway systems. All material was staged and trucked to a local landfill for disposal.

Location: Houston (Houston Ship Channel), Texas

marine construction projects image

Client – Agency / Owner: Marine Support Services

Project Description: Provided dock services and crane support (land and water) to ferry equipment to remote island. Used spud and deck barges to transport equipment to and from the job site and provided crew boats as needed.

Location: Baytown (Houston Ship Channel), Texas

marine construction projects image

Client – Agency / Owner: Marine Equipment Demolition

Project Description: Decontamination and Demolition of marine equipment. Barges, boats, dry docks, etc. can be relocated to our dock for remediation of universal wastes, asbestos abatement, and demolition and dismantlement of the unit.

Location: Channelview (GSD Marine Yard), Texas

marine construction projects image

Client – Agency / Owner: Storage Tank Demolition

Project Description: Industrial storage tanks were loaded on to a deck barge and transported to our dock. Tanks were offloaded for remediation of universal waste and then processed for scrap.

Location: Channelview (GSD Marine Yard), Texas

Client List

  • Alcoa
  • American Commercial Lines (ACL)
  • Blessey Marine Services
  • Boone Towing
  • Brock Services
  • Celanese
  • City of Beaumont
  • Conoco Phillips Sweeny
  • Delta Engineering
  • Derrick Aboard
  • Energy Maintenance Services (EMS USA)
  • Entergy
  • Galveston Sulfur
  • GSD International
  • Gulf Stream Marine
  • Houston Freightliner
  • HPP
  • IFG Port Holdings, LLC
  • Ineos
  • Invista
  • Kellogg Brown & Root (KBR)
  • Kinder Morgan Inc.
  • Kirby Inland Marine
  • Lanier Engineering
  • LyondellBasell
  • McDonough Marine Services
  • Noltex
  • Oil Tanking
  • Pasadena Refinery Systems Inc
  • Port of Beaumont
  • Quality Tubing
  • Shell Oil Company
  • Shelmark Engineering
  • Southwest Shipyard LP
  • Sterling Chemical
  • Styrolution
  • Tri-State Generation
  • US Corp of Engineers (USCOE)
  • UTS Environmental
  • Zachary

Start your project off right, with GSD.

demo accred icons demo accred icons demo accred icons demo accred icons demo accred icons demo accred icons